PHYSICAL SECURITY RISK ASSESSMENT
General Presentation and the need for risk assessment
The necessity to carry out the risk assessment according to HG 301/2012 ART. 2 (1) In order to fulfill the obligations provided by Law no. 333/2003 regarding objective guarding, assets, values and protection of persons, with the subsequent modifications and completions, hereinafter referred to as the Law, the units provided in art. 2 paragraph (1) of the Law, hereinafter referred to as units regardless of the nature of the share capital, the form of organization or association, the way of holding the goods or valuables, must adopt security measures in the forms provided by the Law, supplemented with procedural measures. (3) The adoption of the security measures provided in par. (1) is carried out in accordance with the risk analysis performed by the unit, through specialized structures or through qualified experts, who have acquired professional competences for the occupation of risk assessor for physical security.
The rate of a physical security risk assessment differs from one objective to another, depending on the following elements:
- the type of activity of the company;
- total area and built area;
- number of employees;
- the approximate value of the company's assets;
- the target area;
- security measures implemented;
- number of work points/objectives.
The price includes:
- risk assessment for physical security in accordance with the legal stipulations in the field and validated with the Physical Security Risk Assessment Report, drafted for the contracted objective.
- identifying the risks to the physical security, presenting the necessary recommendations for applying the measures to eliminate or reduce them.
- propose security measures and solutions, by which we want to confer to the analyzed objective, the corresponding level of security, in accordance with the legal standards and stipulations in the field.
- the written guarantee of confidentiality on all data and information that is directly related to the evaluated objective.
Note: Performing the risk analysis does not guarantee that the objective is within the acceptable range of physical security risk,
the value associated with the maximum accepted degree of risk is 60%.
Documents required for evaluation:
- Company registration certificate at ONRC;
- Certified certificate, not older than 30 days;
- The deed of ownership of the land or the lease of the space/land;
- Security plan (if applicable);
- Design of the technical security system (if applicable);
- Blueprints of the objective: a. Situation plan (location of the objective with neighborhoods); b. Relay - objective detailed plan, with dimensions of surfaces;
- Contract for providing services with the specialized security company;
- Contract for prividing monitoring and intervention services;
- Contract for providing security systems maintenance services;
- Certificate of approval and compliance of the equipment that make up the security systems: a. Burglary (alarm) system b. CCTV system (video monitoring system); c. Access control system; d. Safes - protection class e. Glazed surfaces, access and control doors, railings, locks;
- The organizational chart of the company;
- R.O.I./R.O.F./ security policies;
- The situation of the criminal events that took place in the last year in the company;
- Personal/property insurance.
Serviciile de Evaluare de Risc la Securitate Fizică sunt oferite de evaluatori de risc autorizați, sunt oferite de evaluatori de risc autorizați, înscriși în Registrul Național al Evaluatorilor înscriși în Registrul Național al Evaluatorilor de Risc la Securitate Fizică.
OFFER REQUEST
Fill in the form below and we will contact you as soon as possible.